From April 2021, the “Law for Partial Revision of the Air Pollution Control Law” was constructed, and it became mandatory to conduct a preliminary survey of the presence or absence of asbestos when the demolition work was carried out. LINK Co., Ltd., which specializes in building demolition and asbestos analysis and processing at Fuji Shoji Co., Ltd. In cooperation with the company, we will conduct a one-stop process from the demolition/renovation of buildings to collecting and transporting waste including asbestos by conducting preliminary inspections and inspections of the presence or absence of asbestos.
Asbestos processing process
Step 1
Asbestos preliminary investigation and analysis
We will investigate the presence or absence of asbestos by visually viewing design documents or on the ground, prepare a report, prepare a dismantling plan, and submit an application to the administrative agency.
Step 2
Formulation of construction details
Hearing about the planned construction work. We will formulate the best asbestos countermeasure construction based on the cost and construction period according to legal compliance.
Step 3
Asbestos countermeasure construction
We will carry out the construction of the formulated asbestos countermeasures. Here too, we will ensure that the construction is stipulated by law, and try to prevent asbestos exposure and scattering.
Step 4
Proper processing of asbestos
We will transport and dispose of asbestos-containing industrial waste generated from the site with proper and flexible response.